"Bartelt Enterprises recently completed an asphalt job on my property in Stoughton. I am writing to tell you I am very pleased with the quality of the job they did. Not only did your company do a great job on the parking lot, it was done in a timely manner and at a very reasonable rate. If you ever ..."

Josef H

Preparing For Your Maintenance Project

What you should know and do to prepare for the start of your project:

  • Remove anything fragile (yard ornaments, etc.) that are in close proximity to your driveway/parking lot or the areas in which we will be working in and around.
     
  • Remove all vehicles, bikes, etc. from the driveway/parking lot. 
     
  • Be sure we have the proper name(s) and phone number(s) of the individual we are to be working and scheduling the project with.
     
  • We recommend applying an herbicide to areas of your driveway or parking lot that currently have vegetation showing at least 5-7 days prior to our arrival, or at the time you've accepted your contract with us.
     
  • If you have tenants to notify, please post notice to them as soon as possible indicating the dates they should not park on the parking lot, and then the date in which they can resume parking. 
     
  • Customers with any kind of tree cover around their driveway or parking lot. Please know that tree covered and shaded areas of your driveway/parking lot delay drying time of the sealcoat in these areas. Tree covered or shaded areas will need longer than usual drying time. These types of job are generally scheduled on the warmest and sunniest days to help promote drying time.
     
  • Trees, vegetation, shrubbery near your driveway or parking lot do create an invisible residue on the asphalt surface that may cause sealcoat to not properly adhere. This is not something we warranty. 
     
  • Tie back all shrubbery and vegetation off your driveway or parking lot before we arrive to begin your project. 
     
  • If your driveway or parking lot is "dirty", please be sure you've cleaned it off. We do charge extra for this kind of cleaning. 
     
  • If you have multiple projects happening at your property, ex: landscaping, tree removal, etc. please inform us of this so we can schedule accordingly. It's ideal if we come in after all other projects are complete as the driveway or parking lot will not be useable for a minimum of 2-3 days.
     
  • We ask that you kindly keep in mind that inclement weather can and generally will play a factor in our scheduling of your maintenance project, all projects. Should the need to reschedule occur because of weather, please understand we sympathize with you about this and will do our best to accommodate both your schedule and ours.

Our experienced crews will:

  • Clean the asphalt using brooms, high-powered blowers, and edger/weed eaters
     
  • Oil spots are pre-treated with a special treatment to help sealcoat adhere over motor oil, or other stained areas of the driveway.
     
  • A router is used to create a clean, dry reservoir so cracks can be evenly filled with hot crack sealant to protect against moisture infiltration.
     
  • Cracks will be heat-lanced, debris cleaned out and hot crack filled.
     
  • Asphalt will then be sealed with PitchBlackTM premium quality asphalt emulsion sealer.
     
  • Before crews leave, they will put up caution tape across the end of your driveway or parking lot to prevent anyone from driving on your freshly sealed driveway/parking lot. This can be taken down only when the seal coat is completely dry; approximate in 24-48 hrs. Longer may be necessary if weather is cooler or the area sealed is shaded or tree covered.
     
  • We ask that you kindly keep in mind that inclement weather can and generally will play a factor in our scheduling of your maintenance project, all projects. Should the need to reschedule occur because of weather, please understand we sympathize with you about this and will do our best to accommodate both your schedule and ours.

 


What you should know and do to prepare for the start of your project:

  • Remove anything fragile (yard ornaments, etc.) that are in close proximity to your driveway/parking lot or the areas in which we will be working in and around.
     
  • Remove all vehicles, bikes, etc. from the driveway/parking lot. 
     
  • Be sure we have the proper name(s) and phone number(s) of the individual we are to be working and scheduling the project with.
     
  • We recommend applying an herbicide to areas of your driveway or parking lot that currently have vegetation showing at least 5-7 days prior to our arrival, or at the time you've accepted your contract with us.
     
  • If you have tenants to notify, please post notice to them as soon as possible indicating the dates they should not park on the parking lot, and then the date in which they can resume parking. 
     
  • Customers with any kind of tree cover around their driveway or parking lot. Please know that tree covered and shaded areas of your driveway/parking lot delay drying time of the sealcoat in these areas. Tree covered or shaded areas will need longer than usual drying time. These types of job are generally scheduled on the warmest and sunniest days to help promote drying time.
     
  • Trees, vegetation, shrubbery near your driveway or parking lot do create an invisible residue on the asphalt surface that may cause sealcoat to not properly adhere. This is not something we warranty. 
     
  • Tie back all shrubbery and vegetation off your driveway or parking lot before we arrive to begin your project.
     
  • If your driveway or parking lot is "dirty", please be sure you've cleaned it off. We do charge extra for this kind of cleaning. 
     
  • If you have multiple projects happening at your property, ex: landscaping, tree removal, etc. please inform us of this so we can schedule accordingly. It's ideal if we come in after all other projects are complete as the driveway or parking lot will not be useable for a minimum of 2-3 days.
     
  • We ask that you kindly keep in mind that inclement weather can and generally will play a factor in our scheduling of your maintenance project, all projects. Should the need to reschedule occur because of weather, please understand we sympathize with you about this and will do our best to accommodate both your schedule and ours.

Our experienced crews will:

  • Clean the asphalt using brooms, high-powered blowers, and edger/weed eaters.
     
  • Oil spots are pre-treated with a special treatment to help sealcoat adhere over motor oil, or other stained areas of the driveway.
     
  • A router is used to create a clean, dry reservoir so cracks can be evenly filled with hot crack sealant to protect against moisture infiltration.
     
  • Cracks will be heat-lanced, debris cleaned out and hot crack filled.
     
  • Asphalt will then be sealed with PitchBlackTM premium quality asphalt emulsion sealer.
     
  • Before crews leave, they will put up caution tape across the end of your driveway or parking lot to prevent anyone from driving on your freshly sealed driveway/parking lot. This can be taken down only when the seal coat is completely dry; approximate in 24-48 hrs. Longer may be necessary if weather is cooler or the area sealed is shaded or tree covered.
     
  • We ask that you kindly keep in mind that inclement weather can and generally will play a factor in our scheduling of your maintenance project, all projects. Should the need to reschedule occur because of weather, please understand we sympathize with you about this and will do our best to accommodate both your schedule and ours.